Wednesday, April 25, 2007

New ECS Building

It is with annoyance I repost these pictures, I posted them originally from my cell phone when I took them, however despite reporting a successful post, and I'm quite sure charging me for data transfer, they didn't appear on this blog.

Firstly was a picture of the great line of cement trucks waiting to poor the new floor out.


The large pumping tube spewing the concrete into the floor template with worker ants immediately smoothing and leveling out the start of the material foundations for the sound proof floor


Finally late on that evening, were these amazing cement smoothing machines with controllers sitting atop them like giant industrial bumper cars.


Then today I took this which looks like real progress a structure.

0 Comments:

Post a Comment

<< Home